Skip to content
hardware Posted 38d ago — Originally Published 39d ago · youtube.com

Giga Texas Cybercab Production Advances: 53+ Units, Steering-Wheel Free Models

Drone footage from Giga Texas on April 13, 2026 shows 53 Cybercabs at the facility, ongoing construction work on the North Campus including GeoPier drilling and slab work, and preparation for chip fabrication infrastructure.

Related Coverage

0 comments

Log in to join the discussion.

No comments yet.